Iraq Β· 2011
AHDAB Project
10 milliontonnes/year
Electrostatic desalting package
View project record β
SHENYANG SIBIAN GROUP
Engineered for heavy & viscous crude
Through group member Shenyang No.4 Transformer Factory, founded in 1961.
CORE PRODUCT Β· CRUDE OIL TREATMENT
Our focus is heavy and viscous crude. We coordinate process, mechanical, electrical and control requirements around crude properties, available heating, throughput and outlet targets. The agreed project scope defines the supply boundary.

A typical process includes crude heating, wash-water and demulsifier dosing, controlled mixing, primary electrostatic coalescence, secondary polishing, and brine discharge or recycle.
Water ratio, mixing intensity, electric-field arrangement, and operating window are determined from crude properties, unit load, and downstream targets.
VIEW THE PROCESS EXPLORE TWO-STAGE 3D βSHENYANG SIBIAN GROUP Β· MANUFACTURING
Workshop and assembly images from the group website, showing desalter vessels and supporting equipment at different manufacturing stages.
Vessel construction, package configuration and inspection requirements follow the applicable project drawings and specifications.
Shenyang Sibian Group Β· PROJECT EXPERIENCE
Selected from the project records of Shenyang No.4 Transformer Factory, part of Shenyang Sibian Group, covering refinery and overseas desalting installations.
Iraq Β· 2011
10 milliontonnes/year
Electrostatic desalting package
View project record βBeijing, China Β· 2015
8 milliontonnes/year
Electrostatic desalting package
View project record βEcuador Β· 2016
2 milliontonnes/year
Heated electrostatic desalting
View project record βCapacities are recorded plant treatment capacities; years refer to commissioning or installation in the reference list. Contact our team for the applicable supply scope and project conditions.
Explore selected references βTECHNICAL INSIGHTS