Electrostatic desalting and dehydration installation

SHENYANG SIBIAN GROUP

Electrostatic Desalter Packages

Engineered for heavy & viscous crude

Over 60 years of manufacturing heritage

Through group member Shenyang No.4 Transformer Factory, founded in 1961.

Our company β†’

CORE PRODUCT Β· CRUDE OIL TREATMENT

Desalting & Dehydration Packages

Our focus is heavy and viscous crude. We coordinate process, mechanical, electrical and control requirements around crude properties, available heating, throughput and outlet targets. The agreed project scope defines the supply boundary.

01

Process Vessels & Electrodes

02

High-Voltage Power & Protection

03

Wash Water, Mixing & Piping

04

Instrumentation & Control Interfaces

Explore the complete package β†’

View equipment photographs β†’

NK1 two-stage electrostatic desalting concept showing two complete vessels in series
Crude feedStage 1Stage 2Treated crude
NK1 two-vessel series concept. Dimensions and piping arrangements follow approved project drawings.

Two-Stage Electric Desalting Process

A typical process includes crude heating, wash-water and demulsifier dosing, controlled mixing, primary electrostatic coalescence, secondary polishing, and brine discharge or recycle.

Water ratio, mixing intensity, electric-field arrangement, and operating window are determined from crude properties, unit load, and downstream targets.

VIEW THE PROCESS EXPLORE TWO-STAGE 3D β†—

Shenyang Sibian Group Β· PROJECT EXPERIENCE

Electrostatic Desalting Project References

Selected from the project records of Shenyang No.4 Transformer Factory, part of Shenyang Sibian Group, covering refinery and overseas desalting installations.

Beijing, China Β· 2015

Sinopec Yanshan Β· Refinery No. 1

8 milliontonnes/year

Electrostatic desalting package

View project record β†’

Capacities are recorded plant treatment capacities; years refer to commissioning or installation in the reference list. Contact our team for the applicable supply scope and project conditions.

Explore selected references β†’

TECHNICAL INSIGHTS

Understand the process through operating questions

Why is desalted crude salt high when the water result looks normal?

Read the technical insight β†’

When the desalter interface will not stay stable

Read the technical insight β†’

Let’s define your desalter project

CONTACT THE PROJECT TEAM↗